Hot-melting OPP Labeling Machine

OPP labeling machine is used in continuous roll label sticking on bottles by hot glue. It uses local glue spraying method. It consumes less glue and has low running cost. The maximum speed is 600BPM, which is mainly suitable for high-level drinking water and soft drink.,etc production.OPP labeling machine working more high speed and quiet, low glue consumption, compare with shrink label, its lower cost in material.

Product Video

Product Description

Bopp rotary type hot glue labeling machine is a new labeling machine with continuous operation. It is mainly used for cylindrical bottle labeling of OPP, pearl film, composite paper and other rolled material labels. New environmentally friendly materials such as OPP film are used to minimize production costs and save more than 30% production costs. At the same time, the use of environmentally friendly packaging materials is a trend in the development of the packaging industry. The labeling is driven and controlled by servo motor. All electric sensors are imported from Japan with advanced photoelectric, advanced configuration and PLC HMI. This machine has the advantages of fast labeling speed, high accuracy, stable performance, convenient operation, beautiful and flat appearance

Product Details

Technical Parameter

ModelCapacity(BPH)Labeling accuracy (mm)Bottle Diameter (mm)Label Height (mm)Total Power (kw)Dimension(mm)
RG-8K8000±1φ45-φ10035-14012.02640*1800*2200
RG-12K12000±1φ45-φ10035-14013.52640*1800*2200
RG-15K15000±1φ45-φ10035-14013.53000*2100*2200
RG-18K18000±1φ45-φ10035-14020.03000*2600*2200
RG-24K24000±1φ45-φ10035-14025.03000*2600*2200

Factory

1.Professional manufacturer of beverage filling lines.

2.3000 square meter production workshop.

3.More than 20 professional engineers at your service.

4.More than 30 Production Lines Over 20000BPH.

5.Delivering over 100 high-quality production lines globally.

6.Inherited the best technology in the Chinese packaging industry

After-sales Service

1. Immediately engineer sending after visa and ticket ready
2. Over 10-year experienced engineers for machine installation and training
3. 7 days /week online for customer’s trouble shooting after installation
4. 1000㎡ spare parts warehouse ensure quick delivery within 12hours for urgent spare parts replacement

Get A Free Quote

Please enable JavaScript in your browser to complete this form.

Get A Free Quote

Please enable JavaScript in your browser to complete this form.